Oswaldiberg tunnel
Villach
Austria
![Tunnel Tunnel formwork systems](https://rsb.info/wp-content/uploads/2021/06/tunnel-schalungssystem.png)
Project details
- Customer: Strabag AG
- Construction time RSB machine: October 2015 – January 2016
- Dimensions:
Crosscut with D = 3.2 mBlock length = 6.0
-
Special features:
Daily cycle for cross-cutting and transverse transport in the tunnel via low-loader. Special face formwork for connection to the existing tube was designed and supplied by RSB.
![Oswaldiberg tunnel Villach - Austria Oswaldiberg tunnel Villach - Austria](https://rsb.info/wp-content/uploads/2021/06/oberwaldibergtunnel-villach-oesterreich-01.jpg)
Related projects
Contact us
![RSB Formwork Technology RSB Formwork Technology](https://rsb.info/wp-content/uploads/2021/06/RSB-Logo-transparent.png)