Biel | Switzerland

Biel | Switzerland

Tunnel Arch formwork   Biel Switzerland Project details Customer: ATUBO (Walo – PORR – Specogna) Building owner: Canton of Bern Construction time RSB: August 2010 – August 2011 Dimensions:Formwork length: 12,50 mSformwork weight: 165 t Special features:The RSB...
Stuttgart | Germany

Stuttgart | Germany

Stadtbahn TunnelU12 Heilbronnerstr. Stuttgart Germany Project details Customer: Ed. Züblin AG Building owner: State capital Stuttgart Construction time RSB: November 2014 – February 2015 Construction data:Roving radius approx. 3 mWidth of the cavern from 6 m to...
Trimberg | Germany

Trimberg | Germany

Tunnel Trimberg Germany Project details Customer: Arge Tunnel Trimberg (Züblin/Hochtief) Construction time RSB machine: September 2017 – December 2019 Dimensions:3 track and 2 track tunnel tube (variable)Block length L = 10,0 m Special features:The RSB machine...
Tulfes Pfons | Austria

Tulfes Pfons | Austria

Brenner Base Tunnel Tulfes Pfons Austria Project details Customer: Arge Brenner Basistunnel (Strabag/Sallini) Construction time RSB: September 2017 – December 2020 Dimensions:Arched formwork for emergency stops Main tube 15 m spanBlock length L = 12,5m Special...
Villach | Austria

Villach | Austria

Oswaldiberg tunnel Villach Austria Project details Customer: Strabag AG Construction time RSB machine: October 2015 – January 2016 Dimensions:Crosscut with D = 3.2 m Block length = 6.0 Special features:Daily cycle for cross-cutting and transverse transport in...