Tunnel
Arch formwork
Biel
Switzerland

Project details
- Customer: ATUBO (Walo – PORR – Specogna)
- Building owner: Canton of Bern
- Construction time RSB: August 2010 – August 2011
- Dimensions:
Formwork length: 12,50 m
Sformwork weight: 165 t - Special features:
The RSB machine was designed to be able to concrete the emergency stops as well as to be transported through the exit tunnel without major dismantling work.

Related projects
Contact us
