Stuttgart Airport Tunnel Germany

Tunnel formwork systems

Project details

  • Customer: ARGE Flughafentunnel Stuttgart (Züblin | Max Bögl)
  • Building owner: Deutsche Bahn
  • Construction time RSB: Main performance April 2021 to August 2022
  • Trades to be supplied: 2 pcs. couplable arch formwork
  • Dimensions:
  • Block length: 14,2m
  • Special section: 28,4m
  • Weight GWS:2×160 tons
  • Special features: The vault formwork supplied by RSB was dimensioned in such a way that the two formwork carriages can be coupled together. In addition, it was required in the platform area that the entire connected formwork of 28,4m can be used under single-sided concreting with a special anchor system in the invert while the drive through is guaranteed at any time.
The vault formwork supplied by RSB was dimensioned in such a way that the two formwork carriages can be coupled together.