Brenner Base Tunnel
Tulfes Pfons
Austria
![Tunnel Tunnel formwork systems](https://rsb.info/wp-content/uploads/2021/06/tunnel-schalungssystem.png)
Project details
- Customer: Arge Brenner Basistunnel (Strabag/Sallini)
- Construction time RSB: September 2017 – December 2020
- Dimensions:
Arched formwork for emergency stops Main tube 15 m span
Block length L = 12,5m - Special features:
The RSB machine was designed to be able to concrete the emergency stops as well as to be transported through the exit tunnel without major dismantling work.
![Brenner Base Tunnel Tulfes Pfons - Austria Brenner Base Tunnel Tulfes Pfons - Austria](https://rsb.info/wp-content/uploads/2021/06/tulfes-pfons-brenner-basistunnel-01.jpg)
Related projects
Contact us
![RSB Formwork Technology RSB Formwork Technology](https://rsb.info/wp-content/uploads/2021/06/RSB-Logo-transparent.png)