Tunnel Horchheim Germany

Tunnel formwork systems

Project details

  • Customer: ARGE Tunnel Horchheim (Feldhaus Bergbau | PORR | Schnorpfeil)
  • Building owner: Deutsche Bahn
  • Construction time RSB: March 2022 until February 2023
  • Trades to be supplied: Invert formwork, Arch formwork, Niches, After treatment units
  • Dimensions:
  • Block length: 10m
  • Weight of arch formwork: 90 Tons
  • Special features: The tunnel Horchheim has to be renewed in accordance with the applicable regulations. The aim here is to convert the existing tunnel to a single lane tunnel profile with a fully closed concrete inner shell. This inner shell can be easily poured with the supplied formwork system.
The tunnel Horchheim has to be renewed in accordance with the applicable regulations.

Contact us

Hinweise zur Verarbeitung Ihrer Angaben

3 + 10 =

RSB Formwork Technology

Schilfweg 1 · 6972 Fußach · Austria

n

+43 (0) 5578 7960-400

Subscribe to newsletter