Oswaldiberg tunnel

Villach

Austria

Tunnel formwork systems

Project details

  • Customer: Strabag AG
  • Construction time RSB machine: October 2015 - January 2016
  • Dimensions:
    Crosscut with D = 3.2 m

    Block length = 6.0

  • Special features:
    Daily cycle for cross-cutting and transverse transport in the tunnel via low-loader. Special face formwork for connection to the existing tube was designed and supplied by RSB.

Oswaldiberg tunnel Villach - Austria