Two elevated tanks
Gmeineck
Austria
![Round basin Round basin formwork systems](https://rsb.info/wp-content/uploads/2021/06/rundbecken-schalungssystem.png)
Project details
- Construction company: Strabag AG Spittal
- Building owner: Township Spittal an der Drau
- Construction time RSB: August 2021 – September 2021
- Dimensions:
Volume: 2 x 360m³
Cylinder: 9,0 m diameter / 5,7 m height
![Two elevated tanks Gmeineck - Austria Construction of two elevated tanks with climbing formwork from RSB Formwork Technology GmbH](https://www.rsb.info/wp-content/uploads/2022/03/hochbehaelter_rundschalung_gmeineck_oesterreich_01.jpeg)
Related projects
Contact us
![RSB Formwork Technology RSB Formwork Technology](https://rsb.info/wp-content/uploads/2021/06/RSB-Logo-transparent.png)