ARA Jungholz in Uster – renewal of the sludge treatment

Digesters Formwork systems

Project details

  • Customer: Landolt + Co. AG Bauunternehmung
  • Building owner: Town Uster
  • Construction time RSB: September 2022
  • Digestors:
  • Volume: 2 x 1950m³
  • Dimensions: 11,0m diameter / 23,4m height
  • Description: New digestors for sludge treatment at the ARA Jungholz. The special formwork for the pressure door and the pipe cellar was also designed and provided by RSB. The special formwork for the pressure door and the pipe cellar was also designed and provided here by RSB.
The special formwork for the pressure door and the pipe cellar designed and provided by RSB Formwork Technology GmbH