Pier upgrade Steyregg Danube Bridge

Linz

Austria

Special constructions Formwork systems

Project details

  • Customer: Implenia Baugesellschaft GbmH Vienna
  • Building owner: ÖBB Infrastruktur AG
  • Construction time RSB: October 2020 – January 2021
  • Project:
    Base formwork with 45° angle pier formwork
  • Special features:
    The existing pier in the Danube is now dilapidated and needs to be renewed while the railway line remains in operation.
    The bottom of the pier is 7 m below the Danube waterline.

Pier upgrade Steyregg Danube Bridge in Linz - Austria