2 water tanks in Waghäusel Germany

Round basin formwork systems

Project details

  • Customer: HEBERGER GmbH
  • Bulding owner: Zweckverband Wasserversorgung Lußhardt
  • Construction time RSB: September 2022 – Maiy2023
  • Capacity: -
  • Dimensions: 17,04 Diameter / 10.85m height
  • Special features: Two water tanks were built in Waghäusel using the anchorless formwork system from RSB. This construction method guarantees a high level of impermeability and durability of the tanks, especially for the requirements of drinking water supply.
2 water tanks in Waghäusel / Germany