Four vertical in-situ concrete shafts

Solingen-Ittertal

Germany

Shafts Formwork systems

Project details

  • Construction company: Dohrmann August GmbH
  • Building owner: BRW Bergisch Rheinischer Wasserverband
  • Construction time RSB: December 2021 – still in construction
  • Dimensions:
    shaft 18: 4,5 m diameter / 10,9 m height
  • Shaft 19: 6,0 m diameter / 14,7 m height
  • Shaft B1: 7,0 m diameter / 9,2 m height
  • Shaft B2: 6,0 m diameter / 13,0 m height
  • Special features:
    Four in-situ concrete shafts with inlets and outlets flush with the formwork and several flat areas.
Vertical in-situ concrete shaft with flat areas formed with climbing formwork from RSB Formwork Technology GmbH