Oswaldibergtunnel Villach, Austria

Customer: Strabag AG

Construction time RSB Machine: October 2015 - January 2016

Dimensions:
Diameter crosscut section: 3.2m
Length blocks: 6m 

Specifications:
Transport from cross section by truck (machine is able to climb without lifting equipment). Matching cross section to existing main tunnel line: engineering and production by RSB.