Tunnel Trimberg, Germany

Customer: JV Tunnel Trimberg (Züblin/Hochtief)

Construction time RSB Machine: September 2017 - December 2019

Dimensions:
3 lane and 2 lane Tunnelgeometrie (flexible)
Length blocks: 10m 

Specifications:
The customized RSB tunnel lining machine is designed to poor the 2 lane and the 3 lane section of this tunnel.
With low workmanship for adjusting the machine from 2 to 3 lane section the client is able to save costs on the project.