Brenner base tunnel Tulfes Pfons, Austria

Customer: JV Brenner Base Tunnel (Strabag/Sallini)

Construction time RSB Machine: September 2017 - December 2020

Dimensions:
Arch FW for rescue stations with a wing-span of 15m
Length blocks: 12.5m 

Specifications:
The customized RSB tunnel lining machine is designed in a way getting a possibility to concrete the rescue station. Furthermore there is a possibility to pass through the exit tunnel without much technical adjustments.
This causes a big time safing.