RSB Schalungstechnik
Standard Digesters



1.
Assembly of funnel formwork (supporting steel skeleton)


2.
Continuous concrete work, optimum compacting, maximum concrete drop 50 cm


3.
Dismantled funnel


4.
Cylinder: Exterior formwork set up, reinforcement for the first construction phase installed, interior formwork is raised


5.
Spacers for the self-supporting formwork are installed and the formwork is ready for concrete work


6.
Exterior formwork raised after concrete work


7.
Exterior formwork with special buttress design


8.
Hanging scaffolding for opening and closing the exterior formwork


9.
Assembling the support ring for the conical roof formwork


10.
Assembling the support ring for the conical roof formwork


11.
Supporting steel structure of the conical roof formwork assembled


12.
Placement of wooden formwork skin


13.
Reinforcement


14.
Assembly of the exterior formwork for the cone (detail: curved transition piece)


15.
Continuous concrete work, optimum compacting, maximum concrete drop 50 cm


16.
Disassembling the exterior formwork